Accounting › Section R · Job order and process costing › Topic R.3

Predetermined overhead rates

Materials and labour can be traced to each job, but the factory's power bill and the supervisor's salary cannot. A predetermined overhead rate, set before the year begins, lets every job carry a fair share of overhead as it is made.

In this topic

  • Why overhead needs a rate
  • Why not use each month's actual rate?
  • The formula
  • Estimating the overhead
  • Choosing the allocation base
  • Worked example: one budget, three rates
  • Applying overhead to jobs
  • Worked example: a machine-heavy plant
  • One rate or several
  • Common mistakes to avoid
  • Key takeaways

This topic is part of Wuanberri Pro. Checking your access…

← Previous topicNext topic →